Water Rain Main Operating Principles
时间:2017-05-22 来源:Ydtrade浏览次数:182
The operational parameters of the whole process are set via the human-computer interface (touch screen). You only need to set the parameters once and then it will run automatically.
1. After crates filled with products are put into retort sterilizer, retort door and safety interlock device should be closed.
2. Pour process water till it reaches designated position. Please make sure the process water does not soak products (required only in the first cycle)
3. Process water can achieve required heat distribution by means of the below large-scale circulation: pump-filter-heat exchanger-pipeline-spray device-crate-retort bottom
4. During the whole cycle, back pressure is controlled via two automatic valves, which inject or release compressed air.
5 When water pump stops and acoustic-optical signal appears, this cycle of sterilization is over. At this moment, you are allowed to open door, unload crates and prepare for next cycle of sterilization.
- 上一篇:Single-Kettle Water Rain Retort
- 下一篇:没有了 了解更多 Knowledge>>>